Lockout/Tagout 
Overview 
Background 
Services 
Software 
Training 
Our Clients 
Lockouts Explained 
Lockout Samples 
Terms & Definitions 
F.A.Q. 
OSHA 
Request For Information 

 Products & Services 
Lockout/Tagout 
Arc Flash  
Evacuation Plans 
Preventive Maintenance 
Military Documentation 
Technical Writing 
Technical Training 
Visual Aids & Illustrations 
Software & Multimedia 
Industrial Signage 

 Other Options 
Contact Us 
EHS Insider 
HOME 





OSHA

[ Tutorial ] [ Hot Topics ] [ Case Studies ]
[ LOTO standard ] [ LOTO preamble ] [ Compliance directive ]
[ Selected case law ] [ Selected letters of interpretation ]

Case Study 3: Replacement of Nitrogen Pressure Vessel Seals

A group of employees are assigned to replace the head seals on twelve large nitrogen pressure vessels (accumulator bottles) at a manufacturing facility. Each pressure vessel has an operating pressure of about 5,000 psig. Replacement of the seals on each vessel requires that its head be opened, releasing any vessel contents to the atmosphere. The vessels lack individual gauges to indicate internal pressure levels.

<<Previous Case StudyNext Case Study>>
Case Study 1 2 3 4 5 6 7 | Case Studies Overview


 

Call Toll Free 888.741.8252 | Español | Français | Deutsch | Português ©2024 St. Claire, inc.