Lockout/Tagout 
Overview 
Background 
Services 
Software 
Training 
Our Clients 
Lockouts Explained 
Lockout Samples 
Terms & Definitions 
F.A.Q. 
OSHA 
Request For Information 

 Products & Services 
Lockout/Tagout 
Arc Flash  
Evacuation Plans 
Preventive Maintenance 
Military Documentation 
Technical Writing 
Technical Training 
Visual Aids & Illustrations 
Software & Multimedia 
Industrial Signage 

 Other Options 
Contact Us 
EHS Insider 
HOME 





OSHA

[ Tutorial ] [ Hot Topics ] [ Case Studies ]
[ LOTO standard ] [ LOTO preamble ] [ Compliance directive ]
[ Selected case law ] [ Selected letters of interpretation ]

Case Study 4: Multiple Energy Control Procedures

A manufacturing facility has 130 separate lockout procedures. Many of these procedures are unique, and apply to specific pieces of equipment. Some of these procedures, however, are duplicate and address pieces of equipment that are essentially identical to another piece of equipment. The facility has 40 employees authorized to implement the 130 procedures in performing service and maintenance covered by the Lockout/Tagout standard.

The employer has implemented the following procedure for conducting periodic inspections: for the specific energy control procedures, each of the authorized employees is observed by another authorized employee performing a complete lockout of at least one piece of equipment or machinery utilizing each one of the separate energy control procedures. The employer documents each of these inspections. However, there are more specific procedures than there are authorized employees, so consequently some of the specific procedures are not observed being implemented. Instead, these procedures are inspected by holding meetings with small groups of authorized employees responsible for service and maintenance on machines or equipment covered by the procedures being reviewed. At these meetings, the relevant procedures are reviewed by the group to ensure that they are understood and effective, but actual lockout implementation is not required during the inspection.

Case Study #4
Question 1

<<Previous Case StudyNext Case Study>>