OSHA
[ Tutorial ]
[ Hot Topics ]
[ Case Studies ]
[ LOTO standard ]
[ LOTO preamble ]
[ Compliance directive ]
[ Selected case law ]
[ Selected letters of interpretation ]
Question 3 for Case Study 7:
Was the repairman (a millwright by
trade) qualified to verify that the circuit was deenergized?
<<Return to Case Study
Discussion
|