Lockout/Tagout 
Overview 
Background 
Services 
Software 
Training 
Our Clients 
Lockouts Explained 
Lockout Samples 
Terms & Definitions 
F.A.Q. 
OSHA 
Request For Information 

 Products & Services 
Lockout/Tagout 
Arc Flash  
Evacuation Plans 
Preventive Maintenance 
Military Documentation 
Technical Writing 
Technical Training 
Visual Aids & Illustrations 
Software & Multimedia 
Industrial Signage 

 Other Options 
Contact Us 
EHS Insider 
HOME 





OSHA

[ Tutorial ] [ Hot Topics ] [ Case Studies ]
[ LOTO standard ] [ LOTO preamble ] [ Compliance directive ]
[ Selected case law ] [ Selected letters of interpretation ]

Control of Hazardous Energy (Lockout/Tagout)
29 CFR 1910.147

New or Modified Equipment

What is the date after which all new machines and equipment, or all machines and equipment that undergo major repair, renovations or modification, must be equipped with energy-isolating devices capable of accepting a lockout device?

January 2, 1990. (c)(2)(iii)

Go Togray rule
bulletOverview
bulletScope and Application
bulletPurpose
bulletDefinitions
bulletEnergy Control Program
bulletEnergy Control Procedures
   - Documentation
bulletEnergy Control Procedures
   - Required Content
bulletPeriodic Inspection
bulletEmployee Training and
   Communication
bulletAdditional Training (Tagout System)
bulletEmployee Retraining
bulletLockout/Tagout
bulletNew or Modified Equipment
bulletFull Employee Protection
bulletMaterials and Hardware
bulletApplication of Energy Control
bulletRelease from Lockout/Tagout
bulletTesting of Machines
bulletOutside Personnel (Contractors)
bulletGroup Lockout/Tagout
   Requirements
bulletShift & Personnel Changes
gray rule

<<Previous Page | Next Page>>
Printer Friendly Version

 

Call Toll Free 888.741.8252 | Español | Français | Deutsch | Português ©2024 St. Claire, inc.