Lockout/Tagout 
Overview 
Background 
Services 
Software 
Training 
Our Clients 
Lockouts Explained 
Lockout Samples 
Terms & Definitions 
F.A.Q. 
OSHA 
Request For Information 

 Products & Services 
Lockout/Tagout 
Arc Flash  
Evacuation Plans 
Preventive Maintenance 
Military Documentation 
Technical Writing 
Technical Training 
Visual Aids & Illustrations 
Software & Multimedia 
Industrial Signage 

 Other Options 
Contact Us 
EHS Insider 
HOME 





OSHA

[ Tutorial ] [ Hot Topics ] [ Case Studies ]
[ LOTO standard ] [ LOTO preamble ] [ Compliance directive ]
[ Selected case law ] [ Selected letters of interpretation ]

Control of Hazardous Energy (Lockout/Tagout)
29 CFR 1910.147

Testing of Machines

When may lockout or tagout devices be removed temporarily?

In some circumstances, employees need to temporarily restore energy to a machine or piece of equipment during servicing or maintenance to test and /or reposition the machine or piece of equipment. Lockout or tagout devices may be removed temporarily in order to perform these tasks. (f)(1)

What sequence of action must occur in the temporary removal of the lockout/tagout devices?

  1. The machine or equipment must be cleared of tools and materials. (f)(1)(i)
  2. Employees must be removed from the machine or equipment area. (f)(1)(ii)
  3. All lockout or tagout devices may then be removed. (f)(1)(iii)
  4. Authorized employees may then proceed to energize and test or position the equipment or machinery. (f)(1)(iv)
  5. Following testing or positioning, all systems must be deenergized and energy control measures reapplied to continue the servicing and /or maintenance. 
    (f)(1)(v)
Go Togray rule
bulletOverview
bulletScope and Application
bulletPurpose
bulletDefinitions
bulletEnergy Control Program
bulletEnergy Control Procedures
   - Documentation
bulletEnergy Control Procedures
   - Required Content
bulletPeriodic Inspection
bulletEmployee Training and
   Communication
bulletAdditional Training (Tagout System)
bulletEmployee Retraining
bulletLockout/Tagout
bulletNew or Modified Equipment
bulletFull Employee Protection
bulletMaterials and Hardware
bulletApplication of Energy Control
bulletRelease from Lockout/Tagout
bulletTesting of Machines
bulletOutside Personnel (Contractors)
bulletGroup Lockout/Tagout
   Requirements
bulletShift & Personnel Changes
gray rule